- Poor House Farm Park / Nature-Based Playground: A site-prep meeting was held at Poor House Farm Park on Wednesday, June 14th. Signs notifying the public of construction work will be posted for caution and work is expected to begin in about 4 weeks. This will include creating a level 42′ x 42′ pad for the Jungle Dome feature (20′ climbing dome structure), the 3′ rise for the zip line feature (two side-by-side seated parallel zip lines for safe and fun play) and surface prep for the parkour play elements. The installation of these features is scheduled for August. We will provide status update posts as things progress.
- Rooney Park: 1). The playground surface is currently being prepared as well as the creation of a retaining wall at the site. Installation is expected on or after Labor Day. 2). Nature walking trails are being cut-in at the hillside behind the pavilion. There are two trails: one is on move level ground at the lower area and a more challenging course that goes up the hillside. We hope to have those ready in the next 4-5 weeks. Entrances will be marked. More details and updates to be provided as the projects progress. Use caution in the area at this time as there may be equipment on-site at any given time while these improvements are underway.
All work is estimated and could be affected by inclement weather conditions.